Album: 12-08-04 Excavation Complete
Box and bars for concrete have been installed
Date: 12/08/2004
Owner: Gallery Administrator
Size: 13 items
Views: 1168
|
Album: 12-10-04 Concrete Pouring
Concrete!
Date: 12/10/2004
Owner: Gallery Administrator
Size: 35 items
Views: 2222
|
Album: 12-14-04 Concrete Finishing
Date: 12/14/2004
Owner: Gallery Administrator
Size: 16 items
Views: 1241
|
|
Album: 12-20-04 Dome Parts Moved
Dome parts were moved from shipping crate to near-by Civil Engineering Lab for quick access
Date: 12/22/2004
Owner: Gallery Administrator
Size: 5 items
Views: 574
|
Album: 12-30-04 Electrical and Mounting Holes
"Washing" of the electrical pipes and drilling holes through the fiberglass
Date: 01/03/2005
Owner: Gallery Administrator
Size: 19 items
Views: 1375
|
Album: 01-03-05 Nuts and Bolts
Finally, bolting bottom ring to concrete and stacking the walls
Date: 01/03/2005
Owner: Gallery Administrator
Size: 29 items
Views: 1953
|
|
Album: 01-05-05 Rollers Attached
Attached the rollers and some support rods
Date: 01/18/2005
Owner: Gallery Administrator
Size: 8 items
Views: 674
|
Album: 01-07-05 DSR and Door
Added the dome support ring, installed the door, and added the glide strips. The concrete team installed some protective poles
Date: 01/18/2005
Owner: Gallery Administrator
Size: 44 items
Views: 2559
|
Album: 01-10-05 Hemisphere Prep
Bolted the (almost) quads together and installed the deadbolt
Date: 01/18/2005
Owner: Gallery Administrator
Size: 12 items
Views: 1116
|